Projects

Residence Building
Project Name: Residence Building
Location: Tbilisi – Georgia
Materials: Cream Marble, Hond Finishing
Quantity: 600m2 Façade included Montage
Owner: Property Lab. Construction Company
Supplier: PARTONYX , M. R. Shiravand
Date: Oct. – Dec. 2014
Gureli-Hotel
Project Name: GURELI Hotel
Location: Tbilisi, Georgia
Materials: Dark Beige Travertine, Cross Cut, Unfilled, Brushed, 30x60x1 c.m.
Quantity: 600m2
Time: Summer 2014
Chavchavadze
Location: Georgia, Tbilisi, Chavchavadze st., #80
Materials: Grey Granite, Bush hammered & Polished
Works: Material supplying & Montage, Faced & Inside
Quantity: 1600m2
Project Manager: George RIONI
Time: 2013 – 2014
Tiflis Palace
Project Name: Tiflis Palace
Location: Tbilisi – GEORGIA
Materials: Polished Cream Marble / Stairs 3 c.m. & Floor 2 c.m. included water jet cut
Quantity: 330m2
Owner: MAPA LTD
Supplier: PARTONYX LLC, M.R. Shiravand
Date: 2012
Batumi Business Center
Project Name: Batumi Business Center
Location: Batumi City, Georgia
Materials: Filled, Hond, Cross Cut Travertine, 2 & 3 c.m.
Quantity: 3,200m2 facade
Owner: B.T. Mshenebeli LTD.
Supplier: PARTONYX LLC, M.R. Shiravand
Date: 2011-2012
Aghmashenebeli Bridge
Project Name: Aghmashenebeli Bridge – Gifted to Poti City Hall & Poti City
Location: Poti, Georgia
Materials: Chained Crystal Grey marbe 30x20 & 10x10x 3 c.m.
Quantity: 1000 m2 Floor
Owner: Poti City Hall
Supplier: PARTONYX LLC, M.R. Shiravand
Date: Nov. 15 – 2011
Port Baku
Project Name: Port Baku
Location: Baku, Azerbaijan
Materials: Light Grey Granite, Flamed, 15x30x3 c.m., Calibrated.
Quantity: 7,500m2 Outside Floor
Supplier: PARTONYX LLC, M.R. Shiravand
Date: 2010 - 2011
Baku Electronics Central Building
Project Name: SAMSUNG, Baku Electronics Central Building
Location: Baku, Azerbaijan
Materials: Grey Pietra Marble, Polished & Brushed and Black Granite
Quantity: 4,100m2 Floors, Stairs, Parking and Façade included Montage
Owner: Baku Electronics ltd.
Supplier: PARTONYX LLC, M.R. Shiravand
Date: Jan. – June. 2009
Baku Business Center
Project Name: Baku Business Center
Location: Baku, Azerbaijan
Materials: Persian Grey Pietra Marble, 30,40,50 c.m. width x Free length, Brushed.
Quantity: 2,800m2
Supplier: PARTONYX LLC, M.R. Shiravand
Date: 2009 - 2010
Shuvalan Park
Project Name: SHUVALAN PARK
Location: Baku, Azerbaijan
Materials:
  • 2300 m2 / Persian Grey Pietra Marble / Brushed Cut to sizes Slabs for façade & inside elevators / 3 c.m. thickness.
  • 3200 m2 / Persian Grey Pietra Marble / Polished & Hond Tiles & Cut to sizes, Stairs / 2 & 3 c.m. thickness.
  • 300 m2 / Persian Grey Pietra Marble / Brushed & Polished as mosaic.
  • 2250 m2 / Persian Black Granite / Polished & Flamed for outside floors / 10 x free liner meter x 3 c.m. thickness.
Stone Producer & Supplier: PARTONYX LLC, Managed by M. R. SHIRAVAND
Date: 2008 – 2009
Shuvalan_Sport_Complex
Project Name: Shuvalan Sport Complex
Location: Baku, Azerbaijan
Materials: Filled, Polished, Vein Cut Travertine, 2 & 3 c.m. with top figures
Quantity: 2,200m2 facade included Montage
Owner: EL Group
Stone Producer & Supplier: PARTONYX LLC, Managed by M. R. SHIRAVAND
Date: 2007 - 2008
Emirates Palace
Project Name: Emirates Palace
Location: -
Materials: -
Quantity: -
Supplier: -
Date: -
Elias Da Pic
Project Name: Elias Da Pic
Location: -
Materials: -
Quantity: -
Supplier: -
Date: -
Other-Projects
Location: Other
Materials: Other
Architect & Project manager: Other